In Charge of Operations
• Test, measurement and verification are electrical task on VLV, LV and HV equipment.
• These tasks don't require modifying the equipment but can require safety and security measure.
• Operations include Exploitation, Emergency and Lockout.
Specific tasks
Definition : Checking (BE – HE)
• Allow to work alone
• No current or section limitation
• The holder can't lockout for himself.
• Verification of security devices correct operation, measurement of values (insulation, earthing resistance...)
Definition : Test (BE – HE)
• Require to power the equipment but not the operation.
• The holder can have a part or all Responsible of site duties for the test part.
Electrical Authorization depending of the test:
• B2V test, H2V test (Works)
• BR (intervention)
• BE Test, HE Test (lab...)
Definition : Measurement (BE – HE)
• Can touch electrical measure or non-electrical measure
• In most of case, this is included in maintenance, checking and test.
Definition : Operation (BE – HE)
• Exploitation Operation
• Emergency Operation after a fire started.